EcoNest Township Phase 1 - Project

EcoNest Township Phase 1 - Project

Location

KUALA LUMPUR, MY

Status

Ongoing

Size

38,000 m²

Type

Residential Township

Working Days

600 Working Days

Overview

EcoNest Township Phase 1 is a sustainable residential township designed for modern families who value community living and eco-friendly infrastructure. Spanning 38,000 m², it features apartments, villas, parks, and lifestyle amenities within a well-planned layout. The township incorporates wide roads, dedicated pedestrian zones, and green belts to ensure livability and safety. Facilities include schools, healthcare centers, shopping areas, and leisure zones, making it self-sufficient. A central clubhouse, sports complexes, and children’s play areas provide opportunities for recreation and wellness. Sustainable practices such as solar energy, rainwater harvesting, and advanced waste management form the backbone of its design. Security is reinforced with controlled entry points and 24×7 surveillance. Positioned near major highways, EcoNest offers excellent connectivity while maintaining a green and peaceful environment. It sets a benchmark for integrated township development.

Projects Highlights:

  • Spacious, modern-designed units with efficient layouts

  • Landscaped gardens with dedicated walking and sitting zones

  • Multi-purpose clubhouse for community gatherings and events

  • Secure underground parking with smart access control

  • Rooftop terrace lounge for relaxation and scenic views

  • Dedicated children's play zone with safety flooring

  • Fully equipped fitness and wellness center

  • Smart security system with 24×7 surveillance

Project Milestones

Construction
May 2022

Groundbreaking Ceremony & Site Preparation

The project officially began with a formal groundbreaking ceremony attended by key stakeholders, local authorities, and project partners. Site surveys, geotechnical analysis, and environmental assessments were carried out to ensure the location met all regulatory requirements.

Construction
July 2022

Foundation Laying & Structural Planning

After the initial preparation, teams began pouring concrete and installing reinforcements for the foundation. This phase was critical to ensure long-term structural integrity and safety, with engineers conducting repeated testing of materials to meet seismic standards.

Construction
September 2022

Structural Framing & Core Construction

With the foundation cured and ready, construction crews moved into the framing stage. Steel beams, columns, and floor slabs were erected level by level, giving the project its first visible form, with internal core elements built simultaneously.

Construction
November 2022

Exterior Walls & Roofing Installation

This phase brought a dramatic change to the structure's appearance as exterior walls, insulation panels, and windows were installed. Roofing materials were layered for maximum durability, and sustainable materials were integrated throughout.

Construction
January 2023

Facade Completion & Interior Development

The exterior was completed with sleek finishes, giving it a professional and contemporary look. Inside, partitions, ceilings, and flooring installation began alongside lighting, HVAC, and smart building management systems.

Professional Team

View all Members
Julian Park
Julian Park

Mechanical Engineer

Natalia Rivera
Natalia Rivera

Client Relations Head

Ethan Morales
Ethan Morales

Construction Laborer

Thomas Bauer
Thomas Bauer

Development Head

Get in touch with us

We're here to answer your questions, discuss your ideas, and bring your project to life.